top of page
Formwork Accessories

FORMWORK ACCESSORIES

resizer for website (4).png

Flange Nut

BS Drop Forged Coupler

2.png

GALVANIZED

15/17 MM

420G

3.png

GALVANIZED

10/12 MM

450G

DOUBLE

SWIVEL

4.png

GALVANIZED

48.3x48.3MM

0.97-1KG

5.png

GALVANIZED

48.3x48.3MM

1.12-1.15KG

Water Bar Coupler & Washer Plate

WATER BAR

WASHER PLATE

7.png

GALVANIZED/

NATURAL

D10/12MM
D15/17MM

8.png

GALVANIZED/

BLACK

120x120MM
100x100MM

BS Pressed Coupler

DOUBLE

SWIVEL

GALVANIZED

48.3x48.3MM

0.98-1.02KG

9.png
10.png

GALVANIZED

48.3x48.3MM

0.82-0.85KG

Q235

Wing Nut

3.png

GALVANIZED

D17X10MM

0.18KG

4.png

GALVANIZED

D17X10MM

0.3KG

Tie Rod

5.png

15/17MMx6M

THREAD 10MM

45# STEEL

15/17MMX6M

THREAD 10MM

Q235

6.png

10/12MMx6M

THREAD 4MM

45# STEEL

10/12MMx6M

THREAD 4MM

Q235

JIS Pressed Coupler

DOUBLE

SWIVEL

5.png

GALVANIZED

48.6x48.6MM

0.58-0.6KG

6.png

GALVANIZED

48.6x48.6MM

0.58-0.6KG

Adjustable Base & U-Head

U-HEAD

7.png

38x5x600MM

185x150x50x6MM

GALVANIZED

BASE JACK

38x5x600MM

150x150x6MM

GALVANIZED

Steel Props

8.png

2.20M - 4.0M

OUTER PIPE: 60MM x 3.50MM

INNER PIPE:  48MM x 3.50MM

GALVANIZED / H.D.G

3.20M - 5.90M

OUTER PIPE: 76MM x 3.50MM

INNER PIPE:  60MM x 3.50MM

GALVANIZED / H.D.G

Saveco Plastic Board

SAVECO PLASTIC BOARD

2.png
3.png
4.png

Experience the future of formwork construction with our state-of-the-art SAVECO Plastic Board! Specially designed to meet the demanding requirements of the construction industry, our SAVECO Plastic Board offers unmatched durability, versatility, and cost-effectiveness. Whether you are working on residential, commercial, infrastructure, or industrial projects, our formwork solution is the ideal choice for optimizing efficiency and achieving exceptional results.

Key Features & Benefits

1

Superios Strength & Durability

Engineered to withstand the rigorous demands of concrete formwork. Made from high-quality polypropylene, it possesses exceptional strength, impact resistance, and dimensional stability, ensuring long-lasting performance even under heavy loads and adverse weather conditions.

2

Cost-Effective Solution

Offers excellent value for money, as it delivers a longer lifespan compared to traditional formwork materials. The reduced labor, maintenance, and replacement costs associated with our product contribute to significant overall project savings.

3

Reusable & Environment Friendly

Designed for multiple uses, can be reused numerous times without compromising its quality. This reusability reduces material waste, promotes sustainable practices, and significantly lowers overall project costs.

4

Smooth Surface Finish

The smooth surface guarantees an impeccable concrete finish, eliminating the need for additional surface treatments or finishing processes. It results in superior aesthetics, reducing time and effort during the construction process.

5

Lightweight & Easy to Handle

Lightweight, making it effortless to handle and transport. The reduced weight allows for faster installation and dismantling, saving you valuable time and labor costs.

6

Chemical Resistance

Highly resistant to chemicals commonly found in construction environments, including alkaline substances, oils, and solvents. This resistance guarantees that our formwork boards remain intact and functional, even when exposed to harsh elements.

7

Waterproof and Moisture Resistant

With excellent water resistance properties, eliminates concerns about water absorption or warping. It maintains its shape and strength, providing a stable and reliable formwork solution for concrete pouring, regardless of moisture exposure.

8

Versatility & Flexibility

Available in various thicknesses, sizes, and designs to accommodate diverse construction needs. It can be easily cut, drilled, and modified to suit specific project requirements, ensuring seamless integration into any formwork system.

Characteristics

  • Sawed

  • Non-stick

  • Water-Resisant

  • Nailed

  • Screwed

  • Drilled

'up to 60% savings from the film-faced (phenolic) plywood's total projected cost'

2.png

BRIDGE

PROJECT

3.png

BUILDING

PROJECT

bottom of page